Merchandise no:PG52ZY52123000-721K
Voltage:12V
Rated load velocity:four.2rpm
Rated load torque:616.7kgf.cm
No load pace:three.5rpm
Basic information | |
Item name | PG52ZY52123000-721K |
Motor kind | carbon-brush commutator |
Equipment type | Straight gearwheel,planet building |
Housing materials | Steel |
Geartrain materials | Steel and Powdered Metal,POM optional |
CZPT at output shaft | Ball bearing |
Lubricant | Grease for high-minimal temperature, -62—+204 diploma |
Backlash at no-load | <1°,MIN0.3° |
OEM & ODM Service | Available |
Certificate | CE,ROHS,ISO/TS16949 |
An actual product of gearbox and motor mix | |
Merchandise seires | PG52 collection |
An precise Product NO. | PG52ZY52123000-721K |
Motor Voltage(VDC) | 12 |
Motor no load velocity(rpm) | 3000 |
Gearbox reduction ratio | 721 |
Gearmotor no load recent(A) | sixteen |
Gearmotor no load velocity(rpm) | 4.two+/-ten% |
Gearmotor rated load torque(kgf.cm) | 616.seven |
Gearmotor rated recent(A) | <6.500 |
Gearmotor rated load velocity(rpm) | 3.5+/-ten% |
Sounds (DB) | <60DB |
Life span | a thousand+ hours (differs by software) |
Rotation | CW/CCW reversible |
Workshop:
Packing:
Transport:
Certification:
Staff:
FAQ:
Q:1.What variety of motors you can supply?
A: For now, we mostly give planetary gear box dc motors (which includes brush and brushless) with diameter variety in 16~60mm and also Dia10~80mm dimensions equipment motors.
Q:2. Can you send out me a price list?
A: For all of our motors, they are CZPT primarily based on various demands like lifetime, sound, voltage, and shaft and so on. The value also may differ in accordance to annual amount. So it’s truly hard for us to offer a price listing. If you can share your thorough specifications and yearly amount, we’ll see what supply we can give.
Q:3. What’s the lead time for standard purchase?
A: For orders, the normal guide time is 30-35 times and this time can be shorter or longer based on various design, period of time and amount.
Q:four. Is it achievable for you to develop new motors if we can supply tooling expense?
A: Yes. Remember to kindly share the in depth needs like efficiency, measurement, once-a-year amount, concentrate on price tag etc. Then we will make our evaluation to see if we can prepare or not.
Q:5. Can I get some samples?
A: It depends. If only a few samples for private use or substitute, I am scared it’ll be difficult for us to supply because all of our motors are custom made produced and no inventory CZPT if there is no more wants. If just sample tests ahead of the official get and our MOQ, price tag and other terms are satisfactory, we’d enjoy to give samples.