Two Colour Substantial Velocity Flexo Prtinting Equipment
one. Equipment Introduction
This machine is suitable for printing such packing materials as polyethylene, polyethylene plastic bag glass
paper and roll paper etc. And it is a kind of ideal printing equipment for producing paper packing bag for food,
supermarket handbag, vest bag and clothes bag, etc.
two. Device Positive aspects
one. We use stronger steel plate for machine body, which make machine more stable.
two. CZPTcal gear for whole machines, which make the printing quality more accurate and precise.
three. EPC, which adjust the edge of film or paper.
four. Automatic tension controlling, easy to operate.
five. Longer heating oven, improve the printing speed.
6. Doctor blade, which make the ink more equal. CZPT doctor blade is optional.
seven. Separate ink motor to control the ink roller.
eight. Ink pump is optional.
CZPT Info:
Kind | YT-2600 | YT-2800 | YT-21000 | YT-21200 |
Max.Successful Printing Width | 560mm | 760mm | 960mm | 1160mm |
Max.Internet Width | 600mm | 800mm | 1000mm | 1200mm |
Max.Printing Velocity | 60m/min | 60m/min | 60m/min | 60m/min |
Max.Mechanical Velocity | 70 m/min | 70 m/min | 70 m/min | 70 m/min |
Max.Diameter of Roll Content | 450mm | 450mm | 450mm | 450mm |
Inside Diameter of Roll Core | 76mm | 76mm | 76mm | 76mm |
Rang of Repeat Printing Duration | 191-914mm | 191-914mm | 191-914mm | 191-914mm |
Accuracy of Registration | ±0.5mm | ±0.5mm | ±0.5mm | ±0.5mm |
Plate Thickness (Both aspect adhesive incorporated) | 2.38mm | two.38mm | two.38mm | 2.38mm |
Heating Energy | 4Kw | 6Kw | 8Kw | 10Kw |
Complete Energy | 8Kw | 10Kw | 12Kw | 12Kw |
Bodyweight of Equipment | 1800kg | 200kg | 2200kg | 2400kg |
Total Dimension(m) | 2.five*one.7*two.two | 2.five*one.9*two.two | 2.5*two.1*2.2 | two.five*two.3*2.2 |
Equipment Information
one,Q: Your manufacturing unit is buying and selling firm or factory?
A: We are factory. We have more 2100 sq. meter workshop and 23 workers that contains the two installment engineer and one electric engineer.
We are Manufacturing facility, so we have cost benefit than others
two, Q: How do your firm management the device top quality?
A: Very first we handle the raw materials quality.
Next, we manage the quality of machine when we are processing.
3rd, Our installment engineer will examination machine.
3, Q: How about payment expression, payment protection and shipping time?
A: We accept thirty% deposit, equilibrium before shipment. And Irrevocable L/C at sight.
Shipping time is 20 to thirty days. It is according to buy amount.
four,Q: What is your company after sale service?
A: Our installment engineers are CZPT. Usually it will just take about 7 to ten days for all.
Our promise is a single 12 months. If there is any spare areas is broken, we can ship them freely to you.
Welcome to get in touch with with us. We will provide Excellent Price and Substantial Good quality Equipment.